Last week I was given several drawings of different rroms in Pollsmoor prison that I had to update. The trenches that ran beneath the room have changed, therefore I had to make new 'as built' plans of the rooms.
The drawings are as follows:
Substation A:
http://issuu.com/robyn_marais/docs/120730120649-f8980751b53c47579695fada95ea61ef
Substation B:
http://issuu.com/robyn_marais/docs/120730120658-48487665776b45bf80146f90d4f2878a
Substation C:
http://issuu.com/robyn_marais/docs/120730120707-de43a1f1ca91476b90e06ec69263f67e
Substation D:
http://issuu.com/robyn_marais/docs/120730120724-0c0b3222145a46e1ac9c96c48ebd59ed
Substation E:
http://issuu.com/robyn_marais/docs/120730120733-0bd5ede9ec494f338820bae3566ffd78?mode=window&pageNumber=1
Substation F:
http://issuu.com/robyn_marais/docs/120730120744-d09951ae1d4a4826b34e5b6cc5ce47fb?mode=window&pageNumber=1
Substation G:
http://issuu.com/robyn_marais/docs/120730120632-d41ce8d43f5d4f678f64a9585c48e032
Substation 7:
http://issuu.com/robyn_marais/docs/120730120640-4d63accc61b742e5a8bd53f228846202
No comments:
Post a Comment