Pages

Wednesday, 19 September 2012

Erf 15758 on Plein Street, Durbanville

For this project I was given this drawing and was asked to make a few small changes.
Changes included changing the paving on each stoep, and making a few changes to the detail and to the notes on the drawing.

http://issuu.com/robyn_marais/docs/2001_20120919133547

Caveat Trust

Project number 353 - Caveat Trust.

I was given the floor plan of this project and was asked to make a few small changes to the plan.

Once i had done that i was asked to do the electrical layout and the ceiling layout of the given plan:

http://issuu.com/robyn_marais/docs/4003a-_12.09.2012

NOTE: the detail on the drawing was done by Brian.


Another task that i was given regarding the same project was: i was asked to do a detail of how the window frame is attached to the i-beam near the entrance of the building.

http://issuu.com/robyn_marais/docs/details_a_b